Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13600747

- Product Categories
- Friendly Links
Information Name: | Shenyang Feng and badminton equipment manufacturers _ _ Dandong badminton equipment |
Published: | 2015-06-12 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Artificial turf soccer field construction organization to use the premises in accordance with the basic requirements, which is the basis for the 10% of cement concrete foundation or base layer of cement powder reached by conservation requirements, followed by the laying of artificial turf, its main construction program are as follows: 1. Check the entire lawn space , based on the density and flatness whether the requirements, you can begin paving after reaching the artificial turf. 2, the entire site Surveying, measuring position and mark the pitch line, marked with different colors of ink is good, a good position to determine the direction and laying the artificial turf. 3, start laying artificial turf: pavement joints on the lawn at the splicing tape, and fixed thereto with nails, nail head not raised, the transfer of lands required more than 10 cm overlap. 4. Apply glue on the bonding interface, before the glue dried, cut a good lawn tile and engagement, so that each piece of the close bond between the artificial turf. 5, after the laying is complete, need to carefully check the adhesive bonding area is smooth, artificial grass is firmly bonded Anshan badminton equipment stores, after inspection are in line with the requirements of Anshan badminton equipment stores, before proceeding to the next step construction. 6, the need to insert the white line position cut green lawns, set in then connected with, and on top of the glue painted, then to cut a good white artificial grass pitches line inserts the pavement in front of the stadium marked a good line The position of the splicing tape were bonded. 7, if necessary, sprinkle with quartz sand and venue rubber. If you need to put the spilled quartz sand quartz sand or black rubber grains spilled into the machine Anshan badminton equipment stores, promote sprinkle granulator can be quartz sand or black rubber filled artificial turf surfaces. 8. promote sprinkle granulator speed should be uniform, not too fast nor too slow, even to thickness. 9, quartz sand or black rubber finished laying flat and need to check whether adequate, inadequate office is required to consider to fill, pavement require immediate removal of any impurities found in order to ensure quality. 10, paving the quartz sand or particles need to keep dry, in order to facilitate the flow of particles of quartz sand or pavement. 11, after the laying of complete acceptance exit. Silicon PU is an ergonomic and physical properties needed to meet the campaign, with the hard structure under the elastic characteristics and can be based on cement or asphalt construction direct health-based professional elastic synthetic pitch surface material system to single-component organic silicone-modified polyurethane composition of the buffer spring structure, as a two-component modified acrylic abrasion resistant surface layer. ①, excellent weather resistance: silicon PU will not outdoor high, cold climate and other environmental changes and faded, hard, soft, surface whitening phenomenon, even in poor weather and strong ultraviolet radiation, ozone, rain and high temperature environment still able to maintain its long-term bright colors. ②, superior wear resistance: silicon PU surface layer by adding silicone resin particles practices, structural characteristics lasting steady, moderate hardness, wear resistance, high frequency of use to meet the long-term needs. ③, excellent stain resistance: silicon PU surface layer of dense, moderate hardness. Resistance to cracking, peeling, faded white, by a simple rinse clean as new long-term course. Shenyang Feng and badminton equipment manufacturers _ _ Dandong badminton equipment provided by the Shenyang City HSBC and Information Technology Center. Shenyang City HSBC and Information Technology Center (www.4000010001.com) (www.tz1288.com) strong, credible, in Shenyang, Liaoning province IT project cooperation industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead abundance and information technology center and you hand in hand into the brilliant, for a better future! |
Admin>>>
You are the 24433 visitor
Copyright © GuangDong ICP No. 10089450, Shenyang abundance and IT center All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 24433 visitor
Copyright © GuangDong ICP No. 10089450, Shenyang abundance and IT center All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility