Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13600747

- Product Categories
- Friendly Links
Information Name: | Circular plastic runway, the plastic runway Anshan, Shenyang and HSBC |
Published: | 2015-06-13 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | A green silicon PU construction process, construction of the base surface requires the use of cement concrete foundation base Anshan plastic runway construction should meet the following requirements: 1, newly poured concrete should have sufficient curing time (not less than 28 days). 2, the surface roughness, 3 m straightedge tolerance ≤3mm. 3, according to the design grade construction, basic strength c25 above, no cracks, delamination, and so on back to the sand. Second, the main construction method, construction technology base surface treatment process → → sealing primer layer construction → Construction → elastic elastic screed roller interface agent → Construction → Construction → crossed the finish layer 2, the construction techniques 1) first clean work surface, then wetted with water base, with about 5% of dilute hydrochloric acid or oxalic acid spill and wash cement base surface, then rinse with water. 2) dried grass, for obvious protruding part polished, then the primer construction, the construction of the cement base surface hard, dry, clean, smooth, no oil and chalking. 3) to be dried after the construction of grassroots roller primer material good deployment, evenly roll in the cement base surface, play and bond closed. Third, the quality of protection measures 1, a quality target acceptance rate of 100%. 2, the construction program by the company of professional engineering and technical personnel carefully designed through repeated practice. Construction construction company operated by professional staff. 3. The implementation of the ISO 9001 quality material production management mode of operation, approach material certification, inspection reports. Expired or substandard products are not allowed into the site. Fourth, safe and civilized construction measures 1, the construction site should strictly abide by site management system. 2, promptly clean up the scene, prepared to handle the job site waste. Implementation of safe and civilized construction, so that workers Ended clear. 3, the construction site ready to do it neatly stacked materials, in strict accordance with the material specifications and models of different varieties classified put away and set up signs. Plastic floor maintenance analysis 1. All flooring has its own characteristics and quality advantages and disadvantages, according to their characteristics and to develop conservation standards to highlight the material quality, but also thereby extending its life. Plastic flooring materials to be formed on the surface layer of wax on the floor Anshan plastic runway construction and maintenance, all plastic floor though color, structure and diverse, but the surface is not high brightness, but the surface comes with a dust appears to darkened Anshan plastic runway construction , greatly affect the material quality. In particular, the use of higher frequency in public areas, easily damaged by scraping, scratching, burns and severe dust pollution caused by surface damage Anshan plastic runway construction, affecting the beauty of the material and make cleaning more difficult. Therefore, we recommend to be formed to protect the floor surface wax layer, in order to remain the color of the floor, clarity, and easy to clean. 2. Conventional plastic floor maintenance projects delivered just before a simple maintenance, and the demand side or another material dealers are reluctant to bear the maintenance costs, but simply to do some cleaning, wax play again or twice, certainly looks very clean and bright, but from the real needs of the standard is far, is the so-called thousand miles seems the least bit false. 3. Plastic floor maintenance standard three elements 1] [cleanliness of the floor surface should be thoroughly cleaned, or other actions futile]. 2] wax water quality and the number of times [wax molecular structure and passes directly affect the overall firmness of the wax layer]. The hardness of the surface layer of wax] 3 [Surface hardness directly affects the life]. Circular plastic runway, the plastic runway Anshan, Shenyang, Shenyang Fung and provided by HSBC and Information Technology Center. Shenyang City HSBC and Information Technology Center (www.4000010001.com) (www.tz1288.com) strong, credible, in Shenyang, Liaoning province IT project cooperation industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead abundance and information technology center and you hand in hand into the brilliant, for a better future! |
Admin>>>
You are the 24433 visitor
Copyright © GuangDong ICP No. 10089450, Shenyang abundance and IT center All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 24433 visitor
Copyright © GuangDong ICP No. 10089450, Shenyang abundance and IT center All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility